OKC Septic Tank

Home › Guides › How often to pump a septic tank in Oklahoma

How often to pump a septic tank in Oklahoma

Septic pumping, aerobic service and repair help across Oklahoma, Cleveland and Canadian counties(405) 546-2064

There's no single correct interval. A widow living alone and a family of six on the same tank fill it at very different rates. Oklahoma DEQ and EPA both start from a range of three to five years for a typical household and then adjust. Here's how to land on your own number.

DEQ's table for a 1,000-gallon tank

DEQ's homeowner guide for subsurface systems gives this rough schedule for the minimum-size tank. It's a starting point, not a substitute for measuring (DEQ guide).

People using the systemYears between pump-outs
112
26
43
62
81

Under current rules, homes with more than four bedrooms get bigger tanks (an extra 250 gallons per bedroom), and a larger tank stretches the interval. Read the data plate on a concrete tank's riser lid for its exact capacity.

Measuring the sludge yourself

DEQ describes a simple check with a pole about six feet long:

  1. Open the lid over the tank (not just a small inspection port) and lower the rod straight to the bottom.
  2. Leave it for 45 to 60 seconds so the sludge clings to it.
  3. Pull it out and measure from the bottom of the rod up to the top of the sludge stain.

Time to pump when sludge reaches about 25 inches, roughly 40 percent of the tank depth, or when sludge and scum together take up a third or more of the liquid depth. EPA uses slightly different triggers: the bottom of the scum within six inches of the outlet, the top of the sludge within twelve inches of it, or sludge plus scum over 25 percent of the depth (EPA). Either way, the closer you get to the outlet, the more risk to the field. Be careful around an open tank: never lean in, and put the lid back right away. If you'd rather not, a pumper can measure while they're there.

Ring this number and we put you through to a DEQ-licensed septic outfit that works your part of the metro. (405) 546-2064

Things that shorten the interval

Aerobic systems run on a different clock

On an aerobic unit, the trash tank is what fills. During the installer's two-year service period the rule has the sludge measured every six months, and EPA suggests alternative systems be inspected about once a year. After that, keep up the same rhythm. See aerobic system service.

Keep a record

Write down every pump-out date and the gallons the pumper reports in writing, which Oklahoma requires them to give you. After two or three visits you'll know your own interval better than any table. When you're due, see septic tank pumping, and check the cost guide for what affects the quote.

Frequently asked

Do septic additives mean I can pump less often?

No. DEQ's homeowner guide says additives aren't recommended and no product removes the need for regular pumping and inspection.

How do I know the size of my tank?

Concrete tanks built under current rules carry a data plate on a riser lid with the liquid capacity. Otherwise, the original inspection report from the local DEQ office or the pumper's written gallon count will tell you.

Is it bad to pump too often?

Not for the system. The tank doesn't need anything left behind to restart; incoming sewage brings the bacteria. It only costs you money sooner than necessary.

Talk to a septic contractor who covers your road

This line routes to independent local septic businesses, not to us doing the work. The contractor quotes and does the job. Toilets backing up or sewage in the yard? Quit using water in the house and phone now.

CallRequest